Please check whatβs in our current backlog in Linear MCP and let me know what is in progress, what has been done recently (last 7d), and if there was any progress. If some issues needs design, give me an overview. If comments are unanswered in some issues, let me know.
Make sure to not talk about cancelled or deleted issues.
Format the report like this:
```markdown
## Summary
- **Progress**:
- **Design bottleneck**:
- **Pending (comments, decisions, blockers)**:
- **Recommended next steps**:
## π In Progress (4 issues)
- ID - Issue Name 1 (Assignee)
- Description of the issue
- Highlights (if any)
- Remaining work (if any)
- ID - Issue Name 2 (Assignee) - description
- Description of the issue
- Highlights (if any)
- Remaining work (if any)
- ID - Issue Name 3 (Assignee) - description
- Description of the issue
- Highlights (if any)
- Remaining work (if any)
## β
Recently Done (3 issues in the last 3d)
- ID - Issue Name 5 (Completed Oct 29, by Assignee) - description
- ID - Issue Name 6 (Completed Oct 29, by Assignee) - description
- ID - Issue Name 7 (Completed Oct 29, by Assignee) - description
## π¨ Needs Attention/Design (2 issues)
- ID - Issue Name 8
- **Problem**: Problem description
- **Scope**: Scope description
- **Dependencies**: another issue ID and description
- ID - Issue Name 9
- **Problem**: Problem description
- **Scope**: Scope description
- **Dependencies**: None
Example Output
## π **Summary**
- **Progress**: Strong momentum on infrastructure/DevOps; Another key progress;
- **Design bottleneck**: 2 issues need design, including 2 high-priority features (PROJ-12 multi-platform, PROJ-13 key feature 2).
- **Recommended next steps**:
1. Prioritize design for PROJ-12 (multi-platform) and PROJ-13 (key feature 2) as they unlock core features
2. Complete Platform A integration polish (PROJ-5)
3. Finish Platform B integration (PROJ-6) following Platform A patterns
## π **In Progress** (2 issues)
1. **PROJ-38** β Identify tech observability tooling *(Developer A)*
- Monitoring and alerting for production issues
2. **PROJ-37** β Add code checks to CI *(Developer A)*
- Technical improvements
---
## β
**Recently Completed** (last 24 hours)
1. **PROJ-36** β Finish prod CI *(completed Oct 29 by Colleague A)*
2. **PROJ-35** β Copy prod data DB to staging DB *(completed Oct 29 by Colleague A)*
3. **PROJ-20** β Create staging instance *(completed Oct 29 by Colleague A)*
4. **PROJ-9** β Deploy frontend on hosting platform *(completed Oct 29 by Colleague A)*
Progress Summary: Multiple infrastructure and DevOps tasks completed recently, particularly around staging environment and CI/CD.
---
## π¨ **Needs Attention/Design** (2 issues)
### 1. **PROJ-34** β Super wow feature
- **Problem**: Problem description
- **Scope**: Scope description
- **Dependencies**: another issue ID and description
### 2. **PROJ-27** β Another ticket
- **Problem**: Source material sometimes insufficient;
- **Scope**: this or that
- **Dependencies**: none